| Completed Projects | Finish |
| 1. Rehabilitation of the Flood-damaged Structures Upstream the Kvemo Alazani Irrigation Scheme Headworks | 2007-03-15 |
| 2. Rehabilitation of Ilto Inverted Siphon in Akhmeta District | 2007-07-15 |
| 3. Rehabilitation of Zhinvali Multipurpose Hydro Emergency Spillway | 2007-04-30 |
| 4. Rehabilitation of Kvemo Alazani Irrigation Scheme; | 2006-12-01 |
| 5. Reconstruction of the Rioni River Left Bank Protecting Structure in the Ajarians' settlement | 2006-08-09 |
| 6. Reconstruction of the Tskhenistskali River left bank protecting structures upstream Khoni-Lekhaindrao bridge; | 2007-03-13 |
| 7. Reconstruction of the Tskhenistskali River Left Bank Protecting Structures | 2006-12-31 |
| 8. Stage 1 of Rioni-Khobi Drainage Scheme Rehabilitation (600 ha); | 2002-02-12 |
| 9. Stage 1 of Rioni-Choloki Drainage Scheme Rehabilitation (630 ha); | 2003-02-14 |
| 10. Rehabilitation of Khashuri Tunnel at Tashiskari Irrigation Scheme; | 2003-05-13 |
| 11. Rehabilitation of Kvemo Alazani Irrigation Scheme Headworks; | 2005-09-07 |
| 12. Stage 1 of Kvemo Alazani Irrigation Scheme Rehabilitation (1,110 ha); | 2005-09-09 |
| 13. Stage 1 of Tashiskari Irrigation Scheme Rehabilitation (1,003 ha); | 2005-09-12 |
| 14. Stage 2 of Rioni-Khobi Drainage Scheme Rehabilitation (1,100 ha); | 2006-04-08 |
| 15. Rehabilitation of the Regulation Gate at Khoni-Samtredia Irrigation Scheme Headworks; | 2006-07-11 |
| 16. Emergency Rehabilitation Works on Poti Diversion Dam (Package 2); | 2006-07-12 |
| 17. Reconstruction of the Rioni River right embankment in Patara Poti and Sagvamichao Villages; | 2006-07-12 |
| 18. Stage 2 of Rioni-Choloki Drainage Scheme Rehabilitation (1,400 ha); | 2006-07-21 |
| 19. The Aragvi River left bank protection to secure the safety of the intake chamber at pk 25 and water main; | 2006-07-31 |
| 20. The Aragvi River left bank protection to secure the safety of Choporti-Saguramo 1,100 mm pipeline; | 2006-07-31 |
| 21. Reconstruction of the Tskhenistskali River Left Bank Protecting Structures to protect Matkhoji Village (Section 1); | 2006-09-07 |
| 22. Emergency Rehabilitation Works on Poti Diversion Dam (Package 1); | 2006-09-15 |
| 23. Reconstruction of the Tskhenistskali River Left Bank Protecting Structures to protect Khoni Water Supply Headworks (Section 2). | 2006-10-24 |
| 24. Flood Protection of the Drainage Schemes in Tsivi-Tekhuri, Tekhuri-Nogela and Nogela-Tskhenistskali Areas in Senaki and Abasha Districts | 2009-08-04 |
| 25. Repairs and reconstruction of the IDP flats in Tbilsresi Settlement | 2009-05-10 |
| 26. Repairs and rehabilitation of the IDP houses in Rustavi Town | 2009-09-21 |
| 27. Reconstruction of the former Centrolity factory office building in Avchala Highway and of 3 three-storied buildings at 10 and 16 Chirnakhuli Street in Lilo, Tbilisi for the IDP housing | 2009-07-09 |
| 28. Rehabilitation of the former servicemen’s houses in the military settlement of Senaki District for the IDP housing | 2009-11-20 |
| 29. Subproject for the reconstruction of the water supply system in Chiatura Town of Imereti Region | 2009-12-24 |
| 30. Repairs to houses No1 and 2 in the IDP settlement in Agara Village of Kareli District and cottages No 1-5 in Dogliauri Village. | 2009-04-03 |
| 31. Rehabilitation of two four-storied buildings of the former vocational school in the 11th Microdicstrict of Rustavi Town for the IDP housing | 2009-08-24 |
| 32. Repairs and Reconstruction of the IDP Housing in the Former Guards Building in Gardabani Town and in Tbilsresi Settlement | 2009-06-21 |
| 33. REPAIRS TO THE IDP HOUSING IN “FLAT NO1”, “FLAT NO2” AND “HOTEL” IN THE TRAINING CENTER OF POTI TOWN | 2009-09-22 |
| 34. REPAIRS TO THE IDP HOUSING IN THE FORMER KINDERGARTEN NO10, GORI DIVISION OF THE MINISTRY OF INTERNAL AFFAIRS AND RESIDENTAIL BUILDING IN GORI TOWN | 2010-01-28 |
| 35. REPAIRS TO THE IDP HOUSING IN KASPI TOWN | 2009-07-14 |
| 36. REPAIRS TO THE IDP HOUSING IN POTI TOWN | 2009-10-21 |
| 37. REPAIRS TO THE HOUSE AT 34 GR. KHANDZTELI ST. IN AKAHLTSIKHE TOWN FOR THE IDP HOUSING | 2009-07-09 |
| 38. REPAIRS TO THE IDP HOUSING IN KHASHURI TOWN AND SURAMI SETTLEMENT | 2009-05-10 |
| 39. REPAIRS TO THE IDP HOUSING IN SENAKI TOWN | 2010-03-12 |
| 40. REHABILITATION AND RECONSTRUCTION OF THE IDP HOUSING IN THE TEN-STORIED ADMINISTRATION BUILDING AND THE KINDERGARTEN AT AKHALGAZRDOBA AVENUE IN KUTAISI TOWN | 2009-11-12 |
| 41. REPAIRS TO THE IDP HOUSING IN POTI TOWN | 2009-12-02 |
| 42. REPAIRS TO THE IDP HOUSING IN KOPITNARI MILITARY SETTLEMENT IN KUTAISI TOWN | 2009-10-06 |
| 43. REPAIRS TO THE IDP HOUSING IN THE MILITARY COMMISSARIAT BUILDING IN GARDABANI TOWN | 2009-07-01 |
| 44. REPAIRS TO THE IDP HOUSING IN KVALITI SETTLEMENT OF ZESTAFONI TOWN | 2009-11-19 |
| 45. REPAIRS TO THE IDP HOUSING IN MTSKHETA TOWN AND MUKHRANI, SAGURAMO AND TSEROVANI VILLAGES OF MTSKHETA DISTRICT | 2009-11-24 |
| 46. SUB-PROJECT FOR REHABILITATION OF STALIN AND TSABADZE STREETS IN TOWN KARELI | 2010-05-30 |
| 47. REHABILITATION OF THE IDP HOUSING IN THE THREE STORIED ADMINISTRATION BUILDING AT AVTOMSHENEBELI STREET AND IN THE KIDERGARTEN AT MIKELADZE-MEVELE STREET IN KUTAISI TOWN | 2009-10-22 |
| 48. REHABILITATION OF THE IDP HOUSING IN KOPITNARI MILITARY SETTLEMENT IN KUTAISI TOWN | 2009-11-24 |
| 49. REHABILITATION OF THE IDP HOUSING IN THE BULDINGS OF THE FORMER BORDER CHECK-POINT AND SANITARY-AND-EPIDEMIOLOGIC STATION IN KOBULETI TOWN AND OF THE FORMER TECHNICAL SCHOOL IN BATUMI TOWN | 2010-04-29 |
| 50. REHABILITATION OF THE IDP HOUSING IN KOPITNARI MILITARY SETTLEMENT IN KUTAISI TOWN (HOUSES NO 6,7,8,9,10,11,12 AND 14) | 2009-12-10 |
| 51. REHABILITATION OF TOWN VANI WATER SUPPLY SYSTEM | 2010-02-26 |
| 52. SUB-PROJECT FOR RECONSTRUCTION OF VILLAGE LASURIASHI BRIDGE ON RIVER TSKHENISTSKALI IN TSAGERI MUNICIPALITY | 2010-06-01 |
| 53. REPAIRS TO THE IDP HOUSING IN SCHOOL NO7 IN KOBULETI TOWN | 2009-11-07 |
| 54. REPAIRS TO THE BUILDINGS OF JSC “SANATORIUM MTIS KHEOBA” AND JSC “SANATORIUM PLATO” IN BORJOMI TOWN | 2009-12-10 |
| 55. REPAIRS TO THE IDP HOUSING IN THE BACK OFFICE OF THE FORMER MECHANICAL FACTORY AND KINDERGARTEN AT MELIKISHVILI STREET IN BATUMI TOWN | 2010-04-29 |
| 56. REPAIRS TO THE IDP HOUSING IN THE FINANCIAL COLLEGE AT TABUKASHVILI STREET AND IN THE MINING COLLEGE AT GAMSAKHURDIA STREET IN KUTAISI TOWN | 2009-12-11 |
| 57. RECONSTRUCTION OF THE FORMER SCHOOL BUILDING FOR THE IDP HOUSING IN CHAKVI SETTLEMENT OF KOBULETI DISTRICT | 2010-02-08 |
| 58. REHABILITATION OF THE IDP HOUSING IN THE PREVENTIVE CLINIC OF THE RUBBER FACTORY IN CHONKADZE STREET IN KUTAISI TOWN | 2009-12-18 |
| 59. REPAIRING WORKS FOR THE FLATS OF IDPS IN KHOBI DISTRICT VILLAGES | 2010-04-27 |
| 60. REPAIRS TO THE IDP HOUSING IN MARTVILI DISTRICT | 2009-12-16 |
| 61. REPAIRS TO THE IDP HOUSING IN POTI TOWN | 2010-05-24 |
| 62. RECONSTRUCTION OF “AKHALI CHIATURA” HOTEL AND DRIVING SCHOOL BUILDINGS FOR THE IDP HOUSINGIN CHIATURA TOWN | 2009-12-11 |
| 63. REPAIRS TO THE IDP HOUSING IN ZUGDIDI DISTRICT | 2010-03-09 |
| 64. RECONSTRUCTION OF THE IDP HOUSING IN KUTAISI TOWN (RECONSTRUCTION OF THE KINDERGARTEN BUILDING AT IKEA STREET INTO 24-APARTMENT HOUSE) | 2009-10-15 |
| 65. REPAIRS TO THE IDP HOUSING IN GARDABANI TOWN | 2009-12-28 |